Gas Thermostat 220-400F Bulb 5-3/8 Gland 3/8 NPT Commercial Gas Fryer
Gas Thermostat 220-400F Bulb 5-3/8 Gland 3/8 NPT Commercial Gas Fryer
Order before 16:00
NEXT DAY DELIVERY
Mon–Fri, excl. bank holidays. UK stock dispatched same day.
Product Overview
This gas thermostat control is a precision hydraulic snap-acting temperature controller designed for commercial gas fryers. Operating between 220F and 400F (104C to 204C), it regulates gas flow to the burner to maintain consistent oil temperature, protecting your equipment and ensuring uniform frying results throughout a busy service. Built to handle the demanding conditions of professional kitchens, this thermostat is a direct replacement for several widely fitted OEM parts.
Technical Specifications
- Type: Snap-acting hydraulic gas thermostat
- Temperature Range: 220F to 400F (104C to 204C)
- Bulb Dimensions: 5-3/8 inch length x 3/8 inch diameter
- Gland / Tank Connection: 3/8 inch NPT
- Capillary: Copper or nickel-plated copper assembly
- Control Type: Millivolt / gas interruption
- Condition: New
Compatible Equipment
This gas thermostat is compatible with the following commercial catering equipment:
- Pitco — Models 18, 35C, 45C (ref. GSA60301800 / P5047588)
- South Bend Range — 1054000, 1054099
- Hobart — 11327
- Vulcan Hart — GS-A4-018-04-01, GS-A4-018-04-24
- Anets — P8903-37, P8904-46
- Robertshaw Cross-ref — GSA60301800, GS-A6-030-01-01, GS-A6-030-18-00, GS-A6-030-18-14, 4290-00F
- All Points — 461017
Not sure if this fits your equipment? Contact us with your machine make, model and part number and we will confirm compatibility before you order.
Signs You Need To Replace This Part
- Fryer oil temperature fluctuates wildly or will not hold a steady frying temperature
- Oil overheats past the set dial position and safety limit trips repeatedly
- Burner refuses to ignite or cuts out prematurely during a normal cooking cycle
- Visible signs of corrosion, leaking capillary, or a stiff thermostat dial that cannot be turned smoothly
Installation Notes
Drain and cool the fryer fully before fitting. Pass the bulb through the 3/8 inch NPT stuffing gland and route the capillary without kinking. Hand-tighten the gland first, position the bulb clear of the heat exchanger, then fully tighten. Test for oil leaks before lighting. Gas Safe registered engineer installation recommended for all commercial gas appliance repairs in the UK.
Why Buy From LaunchCatering
- UK stock - ready for fast dispatch
- Trusted by professional kitchens since 2020
- Next day delivery available
- Commercial parts specialists
- Contact us if you need help finding the right part
No technical specifications available for this product.